Coordinate the property before opening it.
The right person to approve work can change with the affected space, ownership documents, building systems and the actual permission granted.
Select the property context. This is a coordination guide, not a ruling about who owns a wall, pays a bill or controls a common area.
Keep four decisions separate.
It helps everyone understand what is confirmed and what still needs a decision.
Where is the damage?
Document actual observations, reports, access limits, readings and known connected spaces.
Who can approve access?
Confirm unit, owner, manager, association and common-area permissions for each affected zone.
Who coordinates work?
Separate mitigation from plumbing, HVAC, roofing, electrical, testing and reconstruction tasks.
What records are shared?
Keep the proposed scope, approvals, photos, inspection limits, change orders and closeout documents organized by property and visit.
A printable coordination checklist
Use this checklist with the property manager. The selections stay on this page.
Related resources
If you are coordinating several areas, a clear document trail matters.
Helpful answers
A few questions that apply to these resources.
Do these diagrams tell me what is damaged in my home?
No. The examples show possible pathways or decision factors. A real assessment needs actual property access, observations and appropriate measurements.
Does Serve Xpert test or repair the source of the problem?
We assess accessible conditions and perform approved mitigation/remediation. Independent testing, system repairs and reconstruction are separately coordinated with the responsible qualified professionals.